THE PORTUNUS STABILISATION SYSTEM
#BuiltToLast
The Portunus Stabilisation System (PSS) addresses cable fatigue, providing an engineered seabed interface that mitigates the effects of cable-fatigue on cables and CPS systems, in existing operations and new projects.
Incorporating more than 30 years of lessons learned in the offshore wind, oil, and gas industries, the PSS is an environmentally friendly, durable, and cost-effective solution to a growing problem.
Environmental White Paper
Read the ArticleCurrent methods of cable stabilisation in offshore wind farms, such as rock dumping, inadvertently exacerbate cable degradation issues caused by dynamic water velocities. This approach contributes to increased failure rates, posing significant financial, logistical, and environmental challenges for operators.