Introduction to the Portunus Stabilisation System (PSS). Full webinar with Q&A is available on LinkedIn.
More than 80% of the claims in offshore wind are cable related, and the PSS is aiming to be a preventative system reducing cable fatigue and failure.
The PSS incorporates 30 years of industry know-how and lessons learned manufacturing for the offshore industry.
Estimates suggest there will be approximately 30,000 offshore wind turbines by 2030. Many of these will require cable and CPS stabilisation.
Learn about the root causes of premature cable and CPS failures.